Skip to content
A-104

Site & Alignment Screening

Draw a site, set a buffer, get the constraints and a memo in seconds.

THE PROBLEM

A constraint screening takes a GIS analyst two days in the desktop, and every analyst does it a little differently.

An interactive tool that encodes the firm's screening method: sketch, buffer, weights, overlap acres, parcels, score, and a printable memo.

WHAT YOU GET

  • Constraint layers: floodplain, wetlands, slopes, soils, zoning, parcels, utilities
  • Sketch a site or an alignment, or load a candidate
  • Weighted score with editable weights and a stated formula
  • Side-by-side comparison and a screening memo

VARIANTS

Site suitability · Alignment screening · Wetland and floodplain impact · Solar and cell-site screening

WHO THIS IS FOR

  • Land development and environmental groups
  • Transportation corridor studies
  • County planning departments

THREE SIZES

Starter

2 weeks

Constraint layers prepared in ArcGIS Pro and a documented screening toolbox.

  • • Layer preparation
  • • Pro toolbox
  • • Method memo

Standard

6 weeks

Starter plus the interactive screener shown here, with comparison and memo export.

  • • Everything in Starter
  • • Interactive screener
  • • Weights workshop
  • • Memo template

Full

9–12 weeks

Standard plus batch runs, a public self-service version, and a 12-month retainer.

  • • Everything in Standard
  • • Batch screening service
  • • Self-service public app
  • • 12-month support