A-105 · HOW THE DATA FLOWS

Four data journeys.

Every system on this site is a path that data travels, from the moment someone collects it to the moment someone acts on it. This page follows one real record down each path, with the actual numbers, maps, and rules. No GIS background needed, and you can try the rules yourself along the way.

Each sheet has a route strip, numbered steps you can jump to, a map drawn from the real layers, and one thing to try.

Every journey makes the same four stops

The systems look different, but the shape of the trip is always the same. Learn the four stops once and every sheet below will make sense. Stops can repeat, and a journey can visit them in a different order.

  1. Collect

    Data comes in: a form on a phone, a spreadsheet, a sensor, a public map.

  2. Check

    A rule runs on it: is it valid, is it due, is it in alarm, what does it score.

  3. Keep

    It lands in one shared layer in the cloud, with its history and a backup.

  4. Use

    People read it on a map, a dashboard, a phone, or a memo, and act on it.

SYSTEMCollectCheckKeepUse
D-1Culvert and inlet inventoryA crew's phone form, offlineThe due-date ruleOne hosted layer, plus a nightly backupOffice app and the board's dashboard
D-2Capital projects portalThe project manager's spreadsheetA monthly validation scriptProject layers, with a public viewThe project portal
D-3Water distribution operationsSensors and the repair systemAlarm rules, every 15 minutesOne shared map of pipes, readings, jobsThe wall screen and a manager's phone
D-4Site and alignment screenerPublic agency mapsThe scoring rule, written oncePublished constraint layersA score in the browser and a memo

WORDS TO KNOW

  • Record. One row of data about one thing, like one pipe. It has a location and attributes: facts like size or condition.
  • Layer. A set of records of one kind, like all culverts. A shared spreadsheet that also knows where each row sits on a map.
  • Sync. Copying new or changed records from a phone or another system up to the cloud, so everyone sees the same thing.
  • Script. A small program, here written in Python, that runs on a schedule, checks the data, and moves it along.
  • Dashboard. A screen of maps, counts, and charts that reads the layers live, so it is never out of date.
SHEETD-1

Culvert and inlet inventory

Millbrook Township · Public Works · demo clock 2026-10-01

Phone → cloud layer → office app and dashboard

THE QUESTION

Which pipes under our roads are about to fail?

A culvert is a big pipe that lets a creek or ditch pass under a road. If one rusts out or clogs, water floods over the road or washes it away. The township has to inspect every one on a schedule and fix the worst first.

culverts
180
culverts
inspections on record
1,191
inspections on record
overdue for inspection
32
overdue for inspection
rated poor or failed
42
rated poor or failed
Sandy Hook Rdearth fill over the pipeslope 1 on 2inletoutletcreek increek out48 in CMP pipe · built 199868.5 ft end to end▲ debris at inlet (last inspection note)end view48 in round
A slice through Sandy Hook Rd at CV-0004, drawn the way a road plan draws it: the creek enters the pipe on the upstream side, runs under the earth fill that carries the road, and comes out downstream. The size, length, age, and the last inspection note are the real record.

How one inspection travels

Follow culvert CV-0004 through five stops.

THE ROUTE

Tap a stop to jump to it

  1. FOLLOWINGCV-0004a 48 in pipe under Sandy Hook Rd
  2. 1CollectPhone formA person
  3. 2KeepShared layerAutomatic
  4. 3CheckDue-date ruleAutomatic
  5. 4KeepNightly backupAutomatic
  6. 5UseOffice app + dashboardA person

3 of 5 steps run on their own, with no one typing anything.

  1. 1
    CollectA person

    A crew fills out a form on a phone

    Field Maps app · works with no signal

    Standing in the ditch, the inspector taps the pipe on the map, picks a condition from 1 (failed) to 5 (new), types a note, and takes photos. There is no cell service out here, so the phone keeps everything until it finds signal.

    Like writing a text with no bars. It sends itself once you are back in range.

    Inspect CV-0004● saved offline
    Road
    Sandy Hook Rd · STA 168+50.23
    Material and size
    CMP · 48 in round · 68.5 ft long
    Condition
    12345
    Notes
    Debris at inlet
    Photos (3)
  2. 2
    KeepAutomatic

    It syncs into one shared layer

    ArcGIS Online hosted layer and inspection table

    Back in signal, the record uploads. The culvert's row is updated, and the inspection is added to a history table, so old inspections are never erased. Every edit is stamped with who made it and when.

    Like a group chat. Everyone sees the newest message, and the older ones stay above it.

    CV-0004 inspection history
    DateInspectorRatingComment
    2018-08-04D. Lott5 NewCrushed end, 10%
    2020-05-04J. Harrell5 NewInlet 30% silted
    2022-06-04M. Pittman4 GoodMinor joint separation
    2023-09-04D. Lott3 FairCrushed end, 10%

    4 visits, and the rating went from 5 to 3. The history shows the trend; a single rating would not.

  3. 3
    CheckAutomatic

    A rule works out when it is due next

    Calculated fields

    Nobody types a due date. A rule adds 36 months to the last inspection, or only 12 months if the pipe is rated 2 or worse. If today is past that date, the record is marked overdue.

    TRY ITTry the due-date rule

    Pick a rating for CV-0004

    Last inspected
    2023-09-04
    Wait
    36 months
    Next due
    2026-09-04
    Today
    2026-10-01
    Result
    Overdue by 27 days

    A worse rating shortens the cycle, so a pipe rated 2 comes back onto the list much sooner.

  4. 4
    KeepAutomatic

    Every night, a copy lands on the township's own drive

    Python script → CSV and GeoPackage

    The township owns its data. Even if it stops paying for software someday, it keeps a plain file it can open in Excel or any map program.

    culverts_2026-10-01.csv
    asset_id,road_name,material,diameter_in,condition,next_due,overdue
    CV-0004,Sandy Hook Rd,CMP,48,3,2026-09-04,true
  5. 5
    UseA person

    The office app and the township's dashboard read it live

    Office web app (the demo) · ArcGIS Dashboards

    The engineer filters to overdue pipes and exports a to-do list for next week's crew. The township board opens a dashboard and sees the condition counts without asking anyone for a report. Colors were set once in a shared web map, so a fair pipe is yellow on every screen.

    Office due list, first row
    AssetRoadDueRating
    CV-0004Sandy Hook Rd2026-09-043 Fair
    … 31 more overdue culverts and 48 overdue inlets

All 180 culverts on the township map

Each dot is one culvert, colored by its latest rating. The ring marks CV-0004 on Sandy Hook Rd.

CV-0004
  • Failed
  • Poor
  • Fair
  • Good
  • New
  • River

What the dashboard shows the township board

Culverts by latest rating. The first two bars are the 42 poor or failed pipes to budget for.

  • 1 · Failed4
  • 2 · Poor38
  • 3 · Fair55
  • 4 · Good63
  • 5 · New20

The payoff. The inspection from stop 1 reaches the board's dashboard with no retyping and no spreadsheet in between. The engineer also sees 13 more culverts coming due in the next 90 days.

SHEETD-2

Capital projects portal

City of Ridgeline · Engineering Division · FY26 to FY30

Spreadsheet → checked import → public map

THE QUESTION

What is the city building, where, and when?

A city plans its big construction jobs (roads, water pipes, parks) five years ahead in a Capital Improvement Plan. Residents want to know what is coming to their street. The trick is publishing it without also publishing private details like staff emails or money already spent.

projects
48
projects
total budget
$74.9M
total budget
under construction
12
under construction
milestones tracked
217
milestones tracked
CIP_FY26-30.xlsxproject_nonamebudgetCIP-26-011Improve Rd$511,000CIP-27-004Well no. 6CIP-26-020Riverside Parkmonthlyline = roaddot = sitearea = park
Project managers keep using their spreadsheet. Each row becomes a shape on the map: a line for a road or pipe, a dot for a single site, an area for a park.

How one spreadsheet row travels

Follow project CIP-26-011: Improve Rd Resurfacing, Cheraw Rd to Pearl Ridge Rd.

THE ROUTE

Tap a stop to jump to it

  1. FOLLOWINGCIP-26-011Improve Rd Resurfacing, Cheraw Rd to Pearl Ridge Rd
  2. 1CollectSpreadsheetA person
  3. 2CheckMonthly checkAutomatic
  4. 3KeepProject layersAutomatic
  5. 4KeepPublic viewAutomatic
  6. 5UsePortalA person

3 of 5 steps run on their own, with no one typing anything.

  1. 1
    CollectA person

    A project manager updates a spreadsheet

    Excel or a Survey123 form

    Each project is one row: name, phase, dates, budget, money spent so far, and the manager's contact. Nobody has to learn new software.

    Row for CIP-26-011
    name
    Improve Rd Resurfacing, Cheraw Rd to Pearl Ridge Rd
    category
    Transportation
    phase
    Complete
    start → end
    2025-12-17 → 2026-06-25
    budget
    $511,000
    spent
    $489,223 · staff only
    pm_email
    a.rawls@ridgeline.example · staff only
    funding
    State Grant
  2. 2
    CheckAutomatic

    A script checks every row

    Python import and validation report

    Before anything goes public, the script checks that each row makes sense. A bad row is held back and listed in a report for the manager to fix. Good rows go through.

    Like spell-check for numbers and dates.

    Checks run on CIP-26-011
    • Passes: Project number looks like CIP-yy-nnn
    • Passes: Finish date is after start date (2025-12-17 → 2026-06-25)
    • Passes: Phase is one of the 5 allowed values
    • Passes: Council district is 1 to 5 (it is 1)
    • Fails: Example of a row that would be held back: a finish date before its start date
  3. 3
    KeepAutomatic

    Projects become map layers

    Three layers: points, lines, areas

    Each project lands in the layer that fits its shape. Its milestones and documents, like bid notices, hang off it in linked tables.

    What is in the layers
    LayerCountExample
    Lines20road resurfacing, water mains
    Points18wells, tanks, intersections
    Areas10parks, buildings
    Milestones217Advertised for bids
    Documents84reports and notices
  4. 4
    KeepAutomatic

    The public sees a filtered view

    Read-only layer view

    A view is a window onto the same data with some columns covered up. The public window hides the money spent and the manager's email. Nothing is copied, so the public map is never out of date.

    Like a museum display case. You can see what is inside, but you cannot touch it, and some labels are for staff only.

    TRY ITSwitch between the two windows
    project
    CIP-26-011
    name
    Improve Rd Resurfacing, Cheraw Rd to Pearl Ridge Rd
    phase
    Complete
    start → end
    2025-12-17 → 2026-06-25
    budget
    $511,000
    spent
    $489,223 · staff only
    funding
    State Grant
    pm_name
    A. Rawls
    pm_email
    a.rawls@ridgeline.example · staff only

    Same record, two windows. The public one is not a copy; it is the same row with two columns covered.

  5. 5
    UseA person

    Residents, council members, and staff read the portal

    Project portal (the demo) · optional ArcGIS Hub page

    Everyone gets the same map, list, and timeline. A resident taps their street and sees the dates. A council member filters to their district.

    CIP-26-011 milestones, as the portal shows them
    1. Adopted in the CIP
    2. Design contract awarded
    3. Advertised for bids
    4. Final acceptance

All 48 projects across 5 council districts

Lines are roads and pipes, dots are single sites, shaded shapes are areas. The ring marks CIP-26-011. Dashed outlines are the districts.

D1D2D3D4D5CIP-26-011
  • Planning
  • Design
  • Bid
  • Construction
  • Complete

Where the 48 projects are in their life cycle

A project moves through these phases from top to bottom. The portal sorts its list in this order.

  • Planning10
  • Design14
  • Bid5
  • Construction12
  • Complete7
Money, staff view only
Total budget
$74,923,000
Spent so far
$26,291,172 (35%)
Lane closures now
6 projects

The payoff. The manager edits one spreadsheet. A month later the public map updates by itself, and the private columns never leave City Hall.

SHEETD-3

Water distribution operations

City of Ridgeline · Water Utility · 84.48 miles of main

Sensors and work orders → wall screen and phone

THE QUESTION

Is the water system healthy right now?

Underground pipes called mains carry water from tanks to every faucet in town. Sensors measure water pressure and how full each tank is. A separate system tracks repair jobs, called work orders. Until now, the two never showed up on the same screen.

sensors
12
sensors
readings this week
2,016
readings this week
sensors in alarm
2
sensors in alarm
open work orders (5 emergency)
22
open work orders (5 emergency)
alarm line 12 ftwater 7.6 ftsensor TK-02homes
A tank sits on high ground so gravity pushes water down to homes. If it runs low, pressure drops for everyone it serves. Millbrook Tank is in that situation right now.

How a sensor reading travels

Follow Millbrook Tank (sensor TK-02) and one emergency repair job.

THE ROUTE

Tap a stop to jump to it

  1. FOLLOWINGTK-02Millbrook Tank, a level sensor
  2. 1CollectSensors + repair jobsAutomatic
  3. 2CheckAlarm rulesAutomatic
  4. 3KeepOne mapAutomatic
  5. 4UseWall screenA person
  6. 5UseManager's phoneA person

3 of 5 steps run on their own, with no one typing anything.

  1. 1
    CollectAutomatic

    Sensors and the repair system keep doing their jobs

    SCADA historian (CSV) · work-order system (CMMS)

    SCADA is the control system that reads the sensors. It saves one reading per sensor every hour. The work-order system logs every repair job. Neither one changes; we read the files they already export.

    historian_export.csv (TK-02, last 4 hours)
    sensor_id,read_at,value
    TK-02,2026-09-30T21:00,6.6
    TK-02,2026-09-30T22:00,6.4
    TK-02,2026-09-30T23:00,6.9
    TK-02,2026-10-01T00:00,7.6
  2. 2
    CheckAutomatic

    A script applies the alarm rules

    Python ETL: checks and alarm rules

    The script compares each new reading with that sensor's safe range. Too low or too high is an alarm. If the number has not changed for 2 readings in a row, the sensor may be broken, so it is marked stale.

    Like a fitness watch that buzzes when your heart rate leaves a safe zone, and warns you when it loses contact.

    Rule check, 2026-10-01 00:00
    SensorValueSafe rangeResult
    PS-04 Westside60.9 psi40–90 psiSTALE
    TK-02 Millbrook Tank7.6 ft12–36 ftLOW
    PS-01 Hilltop booster discharge69.9 psi40–90 psiOK

    Westside's 60.9 psi is inside the safe range, but the number has stopped changing. A frozen reading is its own kind of problem.

  3. 3
    KeepAutomatic

    Everything lands on one map

    ArcGIS Online hosted layers

    Readings are appended, added to the end, so the history stays. Pipes, hydrants, valves, sensors, and work orders now share one map, so you can see when a low tank and an open main break are in the same part of town.

    On the shared map
    WhatHow many
    Water mains320 pipes · 84.48 mi
    Hydrants · valves250 · 180
    Pressure zones6
    Sensor readings2,016 (12 sensors × 168 hours)
    Work orders60 (22 still open)
  4. 4
    UseA person

    The control room's wall screen lights up

    ArcGIS Dashboards on a big screen

    The operators on duty see the alarm squares turn red on the map and the tank's line drop below its alarm level. They can send a crew without calling anyone to ask what is going on.

    Wall screen tiles
    Sensors in alarm
    2
    Main breaks, last 30 days
    11
    Median response
    37 hours
    Hydrants flushed this year
    60%
  5. 5
    UseA person

    The manager sees the same thing on a phone

    Manager view (the demo)

    Out at a meeting, the utility manager taps a work order and sees exactly how fast the crew got there. Every time stamp comes straight from the repair system.

    WO-26-0001 · Main break on Hopewell Rd · Emergency
    1. Reported
    2. Crew C assigned
    3. Work started: 3 hour response
    4. Complete: water back on

The whole water system on one map

Blue lines are water mains; shaded areas are the 6 pressure zones. Squares are sensors, red when in alarm. Dots are open work orders, orange for emergencies.

PS-04 · StaleTK-02 · Low
  • Main
  • Sensor OK
  • Sensor alarm
  • Emergency job
  • Other open job

Millbrook Tank, the last 7 days (168 hourly readings)

Water level in feet. The tank held around 26 ft for 5 days, rising and falling with daily use, then fell fast in the last 31 hours, bottoming out at 6.4 ft. The shaded strips are outside the safe range.

012243609/2409/2509/2609/2709/2809/2909/3010/01Low alarm: below 12 ft
TRY IT
Reading10/01 00:007.6 ftLOW ALARM

Drag to any hour. The alarm rule runs on every reading, so it fires at the first one under the line, not when someone happens to look.

The payoff. A drop like this is easy to miss in a spreadsheet of 2,016 numbers. On a chart with an alarm line, anyone can see it, and the alarm fires on its own the moment the level crosses 12 ft.

SHEETD-4

Site and alignment screener

Ridgeline County · planning study · 3 sites, 2 routes

Public data → scoring method → score and memo

THE QUESTION

Where is the best place to build?

Say the county needs land for a new facility. Some land floods, some is protected wetland, some is too steep or too soggy, and some is far from water and sewer pipes. The screener stacks those maps on top of each other and turns how much of each problem is on the site into one score from 0 to 100.

map layers checked
7
map layers checked
land parcels
592
land parcels
best score (Site B)
85.1
best score (Site B)
worst score (Site C)
5.3
worst score (Site C)
soggy soilswetlandsflood zonewater and seweryour site
Each problem is its own see-through map. Put a site on top and look straight down through the stack: whatever lines up under it counts against the score.

How a score is made

Follow Site B, Kokomo Road east.

THE ROUTE

Tap a stop to jump to it

  1. FOLLOWINGSite BKokomo Road east
  2. 1CollectPublic mapsAutomatic
  3. 2CheckScoring ruleA person
  4. 3KeepPublished layersAutomatic
  5. 4CheckScore a sitePerson + script
  6. 5UseMemoA person

2 of 5 steps run on their own, with no one typing anything.

  1. 1
    CollectAutomatic

    Start from public maps anyone can check

    FEMA · National Wetlands Inventory · SSURGO soils · 3DEP elevation

    Federal agencies publish maps of flood zones, wetlands, soil types, and ground elevation, which gives slope. Using named public sources means anyone can check the result later.

    Constraint layers and their sources
    LayerSourceCount
    Flood hazardFEMA flood map3 zones
    WetlandsNWI40
    Steep slopes3DEP elevation18
    Soils (D = soggy)SSURGO60
    Zoning · parcelsCounty36 · 592
    Water, sewer, powerUtilities240 lines
  2. 2
    CheckA person

    Write the scoring method down once

    ArcGIS Pro toolbox · Python

    The rule is simple enough to do on a calculator. Each problem has a weight, how much it matters from 0 to 5, and a share, the fraction of the site it covers from 0 to 1.

    The scoring rule
    penalty = weight × share × 20
    score = 100 − sum of penalties

    Default weights: flood zone 5 · wetlands 5 · steep slopes 3 · soggy soils 2 · farmland 2 · far from pipes 3

    Good above 70 · Fair 40 to 70 · Poor below 40

  3. 3
    KeepAutomatic

    Publish the layers once, use them twice

    ArcGIS Online · batch runs (toolbox or GP service)

    The same prepared layers feed both the website and the county-wide batch run. Because both use the same method on the same data, the score in a browser matches the official run.

    Same method, two places
    In the browser
    one site at a time, instantly
    Batch run
    every parcel in the county
    Site B in both
    85.1 = 85.1
  4. 4
    CheckPerson + script

    A planner draws a site and the app scores it

    Screening app · Maps SDK geometry tools

    The planner sketches the site's outline. The app adds a 100 ft safety buffer around it, measures how much of each problem falls inside, and does the math. For Site B: 65 acres plus the buffer is 79.8 acres; wetlands cover 10.0 of them, and the nearest water or sewer pipe is 683 ft away.

    Like a cookie cutter. Press it on the stacked maps and measure what is inside.

    TRY ITChange the weights and watch the score

    Slide a weight to say how much that problem matters. The shares come from the map and do not change; only the weights do.

    Weight 5
    Weight 5
    Weight 3
    Weight 2
    Weight 2
    Weight 3
    Site BShare of sitePenalty
    flood zonenone on site0%0
    wetlands10.0 of 79.8 ac12%−12.5
    steep slopesnone on site0%0
    soggy soilsnone on site0%0
    farmlandnone on site0%0
    far from pipesnearest pipe 683 ft4%−2.4
    Score85.1 Good

    All candidates at these weights

    • Site B85.1
    • Route 278.7
    • Route 166.7
    • Site A59.4
    • Site C5.3

    Every site is scored with the same weights, so changing one slider re-ranks all of them at once.

  5. 5
    UseA person

    Every score prints to a memo

    PDF from the browser

    The memo lists the inputs, the sources, and the math, so someone reading the project file years later can see why Site B came out on top.

    Screening memo, summary
    Site B: Kokomo Road east, 65.0 ac, 100 ft buffer.
    Score 85.1 (Good). Largest constraint: wetlands, 12% of footprint.
    Sources: FEMA, NWI, SSURGO, 3DEP. Default weights.

The 3 candidate sites on the county map

Blue is the flood zone along the river, green is wetlands, and the yellow wash is soggy (group D) soil. Orange outlines are the candidate sites; dashed orange lines are the two candidate pipe routes.

ABC
  • Flood zone
  • Wetland
  • Soggy soil
  • Candidate site

Scores side by side, at the default weights

Each bar is the score out of 100.

  • Site B85.1
  • Route 278.7
  • Route 166.7
  • Site A59.4
  • Site C5.3
What pulled each site down
SitePenalties
Apipes 3,549 ft away −40.6
Bwetlands −12.5 · pipes 683 ft away −2.4
Cflood zone −54.7 · soggy soils −40.0

The payoff. Site C sits right next to the water and sewer pipes, so it looks convenient. The stacked maps show why it scores only 5.3: flood zone −54.7 · soggy soils −40.0. Planners see that in seconds, before anyone pays for a study.

Every figure on this page is read from the demo data the four apps use, generated from fixed seeds. Places, people, and records are fictional; the methods are real. Maps are drawn from the apps' own layer geometry. Open the demos.