Skip to content

A-101 · FIELD TO OFFICE

Field Inventory & Inspection

From the ditch to the engineer's desk in fifteen seconds.

WHAT THE DELIVERED APP PROVES

A crew's edit in the ditch reaches the office app and the client's dashboard with no retyping and no spreadsheet in between.

DATA FLOW AND ARCHITECTURE

syncnightly01Field captureField Maps, offline02Hosted layer and inspectiontableArcGIS Online180 culverts · 1,191 inspections03Web mapSymbology and forms04Nightly exportPython to CSV andGeoPackage05THIS DEMOOffice web appMaps SDK, Next.js32 culverts overdue06TownshipdashboardArcGIS Dashboards42 poor or failed
  1. 01

    Field capture. A crew records a culvert, its condition, and a photo on a phone, with or without signal.

  2. 02

    Hosted layer and inspection table. One hosted layer is the record. Every edit lands there with who and when.

  3. 03

    Web map. Symbols, labels, and forms are set once and reused by every app.

  4. 04

    Nightly export. The client keeps a copy of its own data on its own drive.

  5. 05

    Office web app. The office filters, flags QA issues, and exports the due list from the same live data.

  6. 06

    Township dashboard. The client sees condition and backlog without asking for a report.

Follow the data step by step →
A-101

What we build

THE PROBLEM

Field crews collect good data on clipboards and phones, and it dies in a spreadsheet the client never sees.

A phone form for the crew, a hosted layer as the record, an office app for QA and inspection scheduling, and a dashboard for the client.

WHAT YOU GET

  • Field Maps form with required fields, pick lists, and photos
  • Hosted asset layer with a related inspection table
  • Office web app: filters, due list, CSV export, QA flag
  • Inspection-cycle rules and a monthly due list

VARIANTS

Culverts and storm inlets · Signs and guardrail · Hydrants and valves · Street lights, sidewalk ramps, trees · Bridges under 20 ft and low-water crossings

WHO THIS IS FOR

  • Firms doing municipal asset inventories or MS4 stormwater compliance
  • County engineers who need a culvert, sign, or hydrant inventory that stays current
  • Towns that want GASB 34 asset reporting without a GIS department

THREE SIZES

Starter

2–3 weeks

Field Maps, hosted layers, and an ArcGIS Dashboards view. No custom code.

  • • Form design and domains
  • • One manual data load
  • • Dashboard
  • • Training for one crew

Standard

5 weeks

Starter plus the office web app shown here, branded for the client, with the due list and export.

  • • Everything in Starter
  • • Office web app
  • • Inspection-cycle rules
  • • Record set at handover

Full

8–10 weeks

Standard plus integration with the client's work-order system, notifications, and a 12-month retainer.

  • • Everything in Standard
  • • Work-order integration
  • • Email alerts for overdue assets
  • • 12-month support