OPERATIONS DASHBOARD · MONITORING AND KPIS
Water Distribution Operations Dashboard
Client: Ridgeline Water Utility, Ridgeline County (fictional)
Prepared by Loren Brown, Chord & Arc
| REV | DESCRIPTION | DATE | BY |
|---|---|---|---|
| 0 | Issued for demo | 2026-10-08 | L. Brown |
SECTION 2
Purpose
The utility's work orders, SCADA pressures and tank levels, and main-break history live in three systems, so the operations manager learns about a bad week from the monthly report instead of the morning screen.
Operations staff, the dispatcher, and the engineer of record open one map-and-dashboard view each morning: open work orders by priority, sensors in alarm, breaks per mile by zone and material, and a scorecard per pressure zone, fed on a schedule from the SCADA historian and the CMMS.
The outcome is faster response to breaks and low pressure, KPIs the utility defined and signed, and a break-rate record that supports the main-renewal program. The same system serves wastewater collection (lift stations, overflows, inflow and infiltration) with different layers and KPIs.
SECTION 3
Users and roles
| ROLE | WHAT THEY DO | WHERE | ARCGIS USER TYPE |
|---|---|---|---|
| Operations manager | Runs the daily ops review, reads KPIs and the zone scorecard, owns the alarm thresholds | Office or phone, browser | Viewer |
| Dispatcher | Assigns and tracks work orders, acknowledges alarms, edits status | Office, browser | Creator |
| Field crew (3 crews) | Update work-order status and add notes and photos in Field Maps | Field, phone or tablet | Mobile Worker |
| Engineer of record (owner) | Defines KPIs and the renewal rule with the utility, reviews break rates, builds and maintains the system | Remote and on site | Creator (admin) |
| Admin | Manages users, groups, the feed credentials, and the view-only wall-screen account | Office | Creator |
| Client project lead | Approves scope, signs the KPI definitions and acceptance | Office | None required |
SECTION 4
Architecture
- 01Feeds: SCADA historian export and CMMS work ordersCSV every 15 min to SFTP (or OPC/REST); CMMS nightly export (or API)
- every 15 min / nightly02Scheduled ETL with QA and alarm rulesPython on ArcGIS Notebooks, a small VM, or GitHub Actions
- append + update03Hosted feature layers + readings table (append, 90-day retention)ArcGIS Online
- 04Ops wall screenArcGIS Dashboards
- 05Manager view, mobile (this demo)ArcGIS Maps SDK for JavaScript, Next.js, Vercel
- The ETL reads files the SCADA and CMMS systems push out; nothing reaches into the SCADA network.
- The ETL evaluates the stale-sensor and alarm rules and sends notification email itself; alerts never depend on someone having the map open.
- Dashboards is the wall screen; this web app is the manager's view on a phone, built on the same hosted layers.
- Optional: ArcGIS Velocity replaces the scheduled ETL when the utility wants true streaming (Full tier).
- Wastewater variant: lift stations, overflow points, and flow meters replace tanks and pressure sensors; KPIs become run hours, overflows, and inflow and infiltration by basin.
SECTION 5
Data model
These tables are generated from the same schema file the demo app and the data generator use, so the sheet cannot drift from the data. Computed fields are derived in the office, not collected.
Pressure zones · polygon · 7 fieldsshowhide
Hydraulic pressure zones, each served by one hydraulic grade line.
Water mains · polyline · 8 fieldsshowhide
Distribution mains, one feature per segment between intersections or half-mile points.
Hydrants · point · 6 fieldsshowhide
Fire hydrants with the flushing record and NFPA flow class.
Valves · point · 6 fieldsshowhide
Isolation valves with the exercise record.
Work orders · point · 13 fieldsshowhide
Work orders from the CMMS export, located at the asset.
Sensors · point · 10 fieldsshowhide
SCADA pressure and tank-level points; the latest value is written by the feed.
Readings · table · 3 fieldsshowhide
Hourly readings related to sensors by sensor_id; the production table appends and keeps 90 days.
SECTION 6
Workflows
Feed ingest and QA
- Every 15 minutes the historian drops a CSV of tag values on the SFTP site; nightly the CMMS exports open and recently closed work orders.
- The ETL maps SCADA tags to sensor_id, appends rows to the readings table, and writes last_value and last_at on each sensor.
- Stale rule: a sensor whose value has not changed for 2 consecutive intervals is marked Stale, which catches both missing data and a flat-lined transmitter.
- Rows that fail validation (unknown tag, out-of-range value, duplicate time) go to a reject file that the admin reviews weekly.
Alarm evaluation and notification
- After each load the ETL evaluates every sensor: Stale first, then Low when the value is strictly below lo_alarm, High when strictly above hi_alarm.
- A new alarm sends one email to the dispatcher list from the ETL (not from the map); a cleared alarm sends a clear notice.
- The dispatcher acknowledges the alarm in the app and, when needed, opens a work order located at the asset.
Daily ops review
- The operations manager opens the app at the start of the shift: open work orders, Emergency open, sensors in alarm.
- Reads the zone scorecard (customers, miles, open orders, breaks per mile, minimum pressure in the last 24 hours) and filters to any zone that stands out.
- The dispatcher moves orders through Open, Assigned, In progress, and Complete; field crews update status from Field Maps.
Monthly KPI report
- On the first business day the manager sets the filters to the month and exports the Insights view to PDF.
- The report carries the KPIs exactly as defined in the signed KPI definitions document, with the definitions printed on the last page.
Renewal planning (default rule)
- DI (ductile iron): assumed service life 100 years.
- CI (cast iron): assumed service life 90 years.
- AC (asbestos cement): assumed service life 60 years.
- PVC (pvc): assumed service life 80 years.
- HDPE (hdpe): assumed service life 80 years.
- remaining_life_yr = max(0, service_life − (current year − install_year)), reduced by 10 years for each break in the last 5 years beyond the first, floored at 0.
- This is a planning-level assumption, not an engineering determination. It is the default rule; the utility replaces it with its own asset-management policy during the KPI definitions workshop.
SECTION 7
Integrations and inputs
| CLIENT PROVIDES | FORMAT | HOW IT ENTERS THE SYSTEM |
|---|---|---|
| Asset GIS: mains, hydrants, valves, pressure zones | File geodatabase, shapefile, or an existing service | Loaded once to hosted layers with the data model's domains; the utility's GIS stays the system of record |
| SCADA tags list | Spreadsheet: tag, description, units, limits | Becomes the sensor layer and the tag-to-sensor mapping the ETL uses |
| SCADA historian export | CSV every 15 minutes to SFTP (Standard) or OPC/REST API (Full) | Appended to the readings table by the scheduled ETL |
| CMMS work-order export (sample, then scheduled) | CSV or XLSX nightly (Standard) or API (Full) | Upserted to the work-order layer by work-order number; located at the asset or address |
| Customer counts by zone | Billing-system extract | Loaded to the zone layer annually; no customer names or account numbers |
| KPI definitions workshop (half day) | Signed definitions document | Each KPI on the dashboard and in the monthly report follows it word for word |
SECTION 8
Security and access
- Organization-only sharing: every layer and app is shared to the utility's ArcGIS Online organization; there is no public access.
- The wall-screen dashboard runs under a view-only account that cannot edit or export.
- The ETL uses its own credential with append and update rights on the feed layers only; the credential lives in the runner's secret store.
- The ETL pulls files the SCADA side pushes out; no inbound connection to the SCADA network is opened.
- No PII: customer counts only, never customer names, addresses, or account numbers.
- The app's basemap key is scoped to basemaps only and restricted to the utility's domain.
- At handover the consultant's admin role is converted to a named support account or removed, and the credentials inventory is delivered in the record set.
SECTION 9
Hosting and running cost
| ITEM | QTY | UNIT | ANNUAL | NOTE |
|---|---|---|---|---|
| ArcGIS Online: Creator (dispatcher) | 1 | $700 / yr | $700 | |
| ArcGIS Online: Mobile Worker (field crews) | 3 | $400 / yr | $1,200 | |
| ArcGIS Online: Viewer (manager, wall screen, engineers) | 4 | $125 / yr | $500 | |
| ArcGIS Online credits (storage, notebooks) | included | 1,250 included | $0 | 90 days of 15-minute readings for a few dozen tags is small; scheduled notebook runs use credits, so confirm the schedule |
| ETL runtime | 1 | GitHub Actions or a small VM | confirm | ArcGIS Notebooks is the alternative and draws on credits |
| Manager web app hosting | 1 | Vercel Pro | included in retainer | Static app; no server to patch |
| ArcGIS Enterprise (on-premises) | optional | priced separately | — | Available for clients whose policies require on-premises hosting |
- Esri US list prices as of 2026-10-08; confirm at purchase. Licenses are bought in the utility's name.
- The consultant's own Creator seat is separate and not billed to the client.
- Worked total for the roles above: $2,400 per year to Esri.
SECTION 10
Delivery plan
| MILESTONE | WHEN | DELIVERABLES |
|---|---|---|
| Scoping (0%) | Week 0 | Problem statement, SCADA tags list and CMMS export sample received, this sheet revised for the utility, fixed-price proposal |
| Schematic (30%) | Week 1–2 | Data model signed, KPI definitions workshop held and signed, ETL reading the sample exports, wireframes |
| Design development (60%) | Week 2–5 | Scheduled feed running against the utility's exports, dashboard and manager app on live data, alarm rules configured |
| Pre-release (90%) | Week 5–6 | One-week feed soak test, stale and alarm rule verification, phone performance check, training outline |
| Issued for use (100%) | Week 7 | Production schedule on, training (2 hours), admin handover, acceptance signed |
| Record set | Week 7–8 | Data dictionary, KPI definitions, ETL runbook, credentials inventory, full export |
SECTION 11
Scope tiers
Starter
3 weeksHosted layers from the utility's GIS and an ArcGIS Dashboards wall screen, loaded by hand.
- • Asset layers
- • Work-order form in Field Maps
- • Dashboards view
Standard
7 weeksStarter plus one scheduled file feed and the manager's dashboard shown here.
- • Everything in Starter
- • One scheduled feed (CSV or SFTP)
- • Custom dashboard
- • Alarm rules
Full
10–14 weeksStandard plus API or SCADA integration, email alerting, and the renewal-planning module.
- • Everything in Standard
- • API/OPC integration
- • Alerting
- • Renewal planning
- • 12-month support
The demo on this site is the Standard tier.
SECTION 12
Acceptance criteria
The client signs this list at Issued for Use. The final 20% is invoiced on signature.
- 1All layers load with the utility's data; every field in the data model is populated or explicitly null.
- 2The feed ingests within the agreed interval (15 minutes for SCADA, nightly for the CMMS) for five consecutive days.
- 3The stale-sensor rule fires after 2 missed intervals, tested by pausing one tag.
- 4Alarm state matches the thresholds exactly (strictly below low, strictly above high) on a test set that includes values equal to each limit.
- 5Every KPI matches the utility's signed definitions document, checked against a hand count for one week.
- 6KPIs, the scorecard, and the charts recompute on every filter change and every feed load.
- 7The core workflows (feed QA, alarm handling, daily review) run end to end by utility staff without the consultant present.
- 8The app loads and is usable on the utility's phones over cellular.
- 9The record set is delivered.
SECTION 13
Operations and maintenance
- Utility: the dispatcher maintains work orders; field crews update status in Field Maps; the admin reviews the ETL reject file weekly.
- Feed monitoring (daily, automated): the ETL emails the admin when a load fails or arrives late; the consultant checks the run history weekly under the retainer.
- Monthly: usage and credit check, broken-link check, reject-file trend.
- Quarterly: SDK and dependency updates, backup export of the hosted layers to GeoPackage, health report.
- Annually: ArcGIS Online renewal, alarm threshold review with the operations manager, renewal-rule review with the engineer of record, customer counts refresh.
- Retainer covers 2 hours of small changes per month; beyond that at the hourly rate with a not-to-exceed.
SECTION 14
Demo notes
Demo data is synthetic. Ridgeline County and its water utility do not exist. The mains, sensors, readings, and work orders are generated, including three seeded anomalies (a low-pressure dip that matches a main-break work order, a tank that does not refill overnight, and a flat-lined sensor) and a main break during live mode; the data model, the SDK, and the workflows are real.
What to tap
- Switch on Live and watch the clock advance
- Tap a sensor in alarm and read its 24-hour series
- Compare breaks per mile by material
Generator seed 103 · demo clock 2026-10-01 · pressure_zones 6 · mains 320 · hydrants 250 · valves 180 · work_orders 60 · sensors 12 · readings 2016 · open work orders 22 · sensors in alarm at load 2 · breaks in 5 yr 112 · miles of main 84.48