Skip to content
SHEET
S-103
STATUS
DEMO
DATE
2026-10-08
REV
0

OPERATIONS DASHBOARD · MONITORING AND KPIS

Water Distribution Operations Dashboard

Client: Ridgeline Water Utility, Ridgeline County (fictional)

Prepared by Loren Brown, Chord & Arc

REVDESCRIPTIONDATEBY
0Issued for demo2026-10-08L. Brown

SECTION 2

Purpose

The utility's work orders, SCADA pressures and tank levels, and main-break history live in three systems, so the operations manager learns about a bad week from the monthly report instead of the morning screen.

Operations staff, the dispatcher, and the engineer of record open one map-and-dashboard view each morning: open work orders by priority, sensors in alarm, breaks per mile by zone and material, and a scorecard per pressure zone, fed on a schedule from the SCADA historian and the CMMS.

The outcome is faster response to breaks and low pressure, KPIs the utility defined and signed, and a break-rate record that supports the main-renewal program. The same system serves wastewater collection (lift stations, overflows, inflow and infiltration) with different layers and KPIs.

SECTION 3

Users and roles

ROLEWHAT THEY DOWHEREARCGIS USER TYPE
Operations managerRuns the daily ops review, reads KPIs and the zone scorecard, owns the alarm thresholdsOffice or phone, browserViewer
DispatcherAssigns and tracks work orders, acknowledges alarms, edits statusOffice, browserCreator
Field crew (3 crews)Update work-order status and add notes and photos in Field MapsField, phone or tabletMobile Worker
Engineer of record (owner)Defines KPIs and the renewal rule with the utility, reviews break rates, builds and maintains the systemRemote and on siteCreator (admin)
AdminManages users, groups, the feed credentials, and the view-only wall-screen accountOfficeCreator
Client project leadApproves scope, signs the KPI definitions and acceptanceOfficeNone required

SECTION 4

Architecture

  1. 01
    Feeds: SCADA historian export and CMMS work orders
    CSV every 15 min to SFTP (or OPC/REST); CMMS nightly export (or API)
  2. every 15 min / nightly
    02
    Scheduled ETL with QA and alarm rules
    Python on ArcGIS Notebooks, a small VM, or GitHub Actions
  3. append + update
    03
    Hosted feature layers + readings table (append, 90-day retention)
    ArcGIS Online
  4. 04
    Ops wall screen
    ArcGIS Dashboards
  5. 05
    Manager view, mobile (this demo)
    ArcGIS Maps SDK for JavaScript, Next.js, Vercel
Edges: Feeds: → Scheduled; Scheduled → Hosted; Hosted → Ops; Hosted → Manager
  1. The ETL reads files the SCADA and CMMS systems push out; nothing reaches into the SCADA network.
  2. The ETL evaluates the stale-sensor and alarm rules and sends notification email itself; alerts never depend on someone having the map open.
  3. Dashboards is the wall screen; this web app is the manager's view on a phone, built on the same hosted layers.
  4. Optional: ArcGIS Velocity replaces the scheduled ETL when the utility wants true streaming (Full tier).
  5. Wastewater variant: lift stations, overflow points, and flow meters replace tanks and pressure sensors; KPIs become run hours, overflows, and inflow and infiltration by basin.

SECTION 5

Data model

These tables are generated from the same schema file the demo app and the data generator use, so the sheet cannot drift from the data. Computed fields are derived in the office, not collected.

Pressure zones · polygon · 7 fieldsshow

Hydraulic pressure zones, each served by one hydraulic grade line.

Water mains · polyline · 8 fieldsshow

Distribution mains, one feature per segment between intersections or half-mile points.

Hydrants · point · 6 fieldsshow

Fire hydrants with the flushing record and NFPA flow class.

Valves · point · 6 fieldsshow

Isolation valves with the exercise record.

Work orders · point · 13 fieldsshow

Work orders from the CMMS export, located at the asset.

Sensors · point · 10 fieldsshow

SCADA pressure and tank-level points; the latest value is written by the feed.

Readings · table · 3 fieldsshow

Hourly readings related to sensors by sensor_id; the production table appends and keeps 90 days.

SECTION 6

Workflows

Feed ingest and QA

  1. Every 15 minutes the historian drops a CSV of tag values on the SFTP site; nightly the CMMS exports open and recently closed work orders.
  2. The ETL maps SCADA tags to sensor_id, appends rows to the readings table, and writes last_value and last_at on each sensor.
  3. Stale rule: a sensor whose value has not changed for 2 consecutive intervals is marked Stale, which catches both missing data and a flat-lined transmitter.
  4. Rows that fail validation (unknown tag, out-of-range value, duplicate time) go to a reject file that the admin reviews weekly.

Alarm evaluation and notification

  1. After each load the ETL evaluates every sensor: Stale first, then Low when the value is strictly below lo_alarm, High when strictly above hi_alarm.
  2. A new alarm sends one email to the dispatcher list from the ETL (not from the map); a cleared alarm sends a clear notice.
  3. The dispatcher acknowledges the alarm in the app and, when needed, opens a work order located at the asset.

Daily ops review

  1. The operations manager opens the app at the start of the shift: open work orders, Emergency open, sensors in alarm.
  2. Reads the zone scorecard (customers, miles, open orders, breaks per mile, minimum pressure in the last 24 hours) and filters to any zone that stands out.
  3. The dispatcher moves orders through Open, Assigned, In progress, and Complete; field crews update status from Field Maps.

Monthly KPI report

  1. On the first business day the manager sets the filters to the month and exports the Insights view to PDF.
  2. The report carries the KPIs exactly as defined in the signed KPI definitions document, with the definitions printed on the last page.

Renewal planning (default rule)

  1. DI (ductile iron): assumed service life 100 years.
  2. CI (cast iron): assumed service life 90 years.
  3. AC (asbestos cement): assumed service life 60 years.
  4. PVC (pvc): assumed service life 80 years.
  5. HDPE (hdpe): assumed service life 80 years.
  6. remaining_life_yr = max(0, service_life − (current year − install_year)), reduced by 10 years for each break in the last 5 years beyond the first, floored at 0.
  7. This is a planning-level assumption, not an engineering determination. It is the default rule; the utility replaces it with its own asset-management policy during the KPI definitions workshop.

SECTION 7

Integrations and inputs

CLIENT PROVIDESFORMATHOW IT ENTERS THE SYSTEM
Asset GIS: mains, hydrants, valves, pressure zonesFile geodatabase, shapefile, or an existing serviceLoaded once to hosted layers with the data model's domains; the utility's GIS stays the system of record
SCADA tags listSpreadsheet: tag, description, units, limitsBecomes the sensor layer and the tag-to-sensor mapping the ETL uses
SCADA historian exportCSV every 15 minutes to SFTP (Standard) or OPC/REST API (Full)Appended to the readings table by the scheduled ETL
CMMS work-order export (sample, then scheduled)CSV or XLSX nightly (Standard) or API (Full)Upserted to the work-order layer by work-order number; located at the asset or address
Customer counts by zoneBilling-system extractLoaded to the zone layer annually; no customer names or account numbers
KPI definitions workshop (half day)Signed definitions documentEach KPI on the dashboard and in the monthly report follows it word for word

SECTION 8

Security and access

  • Organization-only sharing: every layer and app is shared to the utility's ArcGIS Online organization; there is no public access.
  • The wall-screen dashboard runs under a view-only account that cannot edit or export.
  • The ETL uses its own credential with append and update rights on the feed layers only; the credential lives in the runner's secret store.
  • The ETL pulls files the SCADA side pushes out; no inbound connection to the SCADA network is opened.
  • No PII: customer counts only, never customer names, addresses, or account numbers.
  • The app's basemap key is scoped to basemaps only and restricted to the utility's domain.
  • At handover the consultant's admin role is converted to a named support account or removed, and the credentials inventory is delivered in the record set.

SECTION 9

Hosting and running cost

ITEMQTYUNITANNUALNOTE
ArcGIS Online: Creator (dispatcher)1$700 / yr$700
ArcGIS Online: Mobile Worker (field crews)3$400 / yr$1,200
ArcGIS Online: Viewer (manager, wall screen, engineers)4$125 / yr$500
ArcGIS Online credits (storage, notebooks)included1,250 included$090 days of 15-minute readings for a few dozen tags is small; scheduled notebook runs use credits, so confirm the schedule
ETL runtime1GitHub Actions or a small VMconfirmArcGIS Notebooks is the alternative and draws on credits
Manager web app hosting1Vercel Proincluded in retainerStatic app; no server to patch
ArcGIS Enterprise (on-premises)optionalpriced separately—Available for clients whose policies require on-premises hosting
  • Esri US list prices as of 2026-10-08; confirm at purchase. Licenses are bought in the utility's name.
  • The consultant's own Creator seat is separate and not billed to the client.
  • Worked total for the roles above: $2,400 per year to Esri.

SECTION 10

Delivery plan

MILESTONEWHENDELIVERABLES
Scoping (0%)Week 0Problem statement, SCADA tags list and CMMS export sample received, this sheet revised for the utility, fixed-price proposal
Schematic (30%)Week 1–2Data model signed, KPI definitions workshop held and signed, ETL reading the sample exports, wireframes
Design development (60%)Week 2–5Scheduled feed running against the utility's exports, dashboard and manager app on live data, alarm rules configured
Pre-release (90%)Week 5–6One-week feed soak test, stale and alarm rule verification, phone performance check, training outline
Issued for use (100%)Week 7Production schedule on, training (2 hours), admin handover, acceptance signed
Record setWeek 7–8Data dictionary, KPI definitions, ETL runbook, credentials inventory, full export

SECTION 11

Scope tiers

Starter

3 weeks

Hosted layers from the utility's GIS and an ArcGIS Dashboards wall screen, loaded by hand.

  • • Asset layers
  • • Work-order form in Field Maps
  • • Dashboards view

Standard

7 weeks

Starter plus one scheduled file feed and the manager's dashboard shown here.

  • • Everything in Starter
  • • One scheduled feed (CSV or SFTP)
  • • Custom dashboard
  • • Alarm rules

Full

10–14 weeks

Standard plus API or SCADA integration, email alerting, and the renewal-planning module.

  • • Everything in Standard
  • • API/OPC integration
  • • Alerting
  • • Renewal planning
  • • 12-month support

The demo on this site is the Standard tier.

SECTION 12

Acceptance criteria

The client signs this list at Issued for Use. The final 20% is invoiced on signature.

  1. 1All layers load with the utility's data; every field in the data model is populated or explicitly null.
  2. 2The feed ingests within the agreed interval (15 minutes for SCADA, nightly for the CMMS) for five consecutive days.
  3. 3The stale-sensor rule fires after 2 missed intervals, tested by pausing one tag.
  4. 4Alarm state matches the thresholds exactly (strictly below low, strictly above high) on a test set that includes values equal to each limit.
  5. 5Every KPI matches the utility's signed definitions document, checked against a hand count for one week.
  6. 6KPIs, the scorecard, and the charts recompute on every filter change and every feed load.
  7. 7The core workflows (feed QA, alarm handling, daily review) run end to end by utility staff without the consultant present.
  8. 8The app loads and is usable on the utility's phones over cellular.
  9. 9The record set is delivered.

SECTION 13

Operations and maintenance

  • Utility: the dispatcher maintains work orders; field crews update status in Field Maps; the admin reviews the ETL reject file weekly.
  • Feed monitoring (daily, automated): the ETL emails the admin when a load fails or arrives late; the consultant checks the run history weekly under the retainer.
  • Monthly: usage and credit check, broken-link check, reject-file trend.
  • Quarterly: SDK and dependency updates, backup export of the hosted layers to GeoPackage, health report.
  • Annually: ArcGIS Online renewal, alarm threshold review with the operations manager, renewal-rule review with the engineer of record, customer counts refresh.
  • Retainer covers 2 hours of small changes per month; beyond that at the hourly rate with a not-to-exceed.

SECTION 14

Demo notes

Demo data is synthetic. Ridgeline County and its water utility do not exist. The mains, sensors, readings, and work orders are generated, including three seeded anomalies (a low-pressure dip that matches a main-break work order, a tank that does not refill overnight, and a flat-lined sensor) and a main break during live mode; the data model, the SDK, and the workflows are real.

What to tap

  1. Switch on Live and watch the clock advance
  2. Tap a sensor in alarm and read its 24-hour series
  3. Compare breaks per mile by material

Generator seed 103 · demo clock 2026-10-01 · pressure_zones 6 · mains 320 · hydrants 250 · valves 180 · work_orders 60 · sensors 12 · readings 2016 · open work orders 22 · sensors in alarm at load 2 · breaks in 5 yr 112 · miles of main 84.48